Structural Steel

24/08/2015

e-blast Ltd have recently completed a challenging package for the oil and gas sector comprising of 2800m² of Structural Steel.

The structural package consisted of a 525m² skid base, and was build up with a mezzanine level floor, side walls, end walls and roof panels.

Along with the structural steelwork, e-blast Ltd completed the coating of all the pipework associated with this package.

The package was coated in complete compliance with Norsok standards, NACE level III inspection from day 1 until completion.

Every system had an approved e-blast Ltd procedure and successfully completed CPT, carried out 1 month prior to production.

Coating systems on the package consisted of:

• Norsok M-501 System 5a – Chartek 7 Fire Protection
• Norsok M-501 System 2a – TSA & High Temperature Silicone Sealer
• Norsok M-501 System 1 – 3 coat Epoxy System
• Norsok M-501 System 6c – 2 coat Epoxy Phenolic for Insulated Stainless Piping

As well as carrying out all these activities in-house at our purpose built facility, e-blast Ltd followed the build up to the client site, and carried out all tie-in sections of each system after assembly in the most challenging of environments, meanwhile maintaining complete compliance to Norsok / Specification requirements.